NBIA Wastewater Treatment Works
Client: New Bangkok International Airport
Location: Suvarnabhumi Airport, Thailand
Highlight of Features:
The BNR wastewater treatment plant with a mechanical dewatering using sludge centrifuge and complete with an effluent reuse or tertiary treatment system.
Challenges and Solution:
Completion Date: 2 April 2003
Contract Value : 148,665.702.27 MB, total
Aquathai is a nominated subcontractor to Italian-Thai Development for the NBIA or Suvarnabhumi Airport wastewater treatment project. The Central utilities consist of water supply and central wastewater treatment system supporting new international airport and its facility. The scope of service included detail design rechecking services for process, mechanical and electrical work, procurement, supply, installation and commissioning for the NBIA wastewater treatment work.
- Inlet Pumping System
- Pretreatment system- Drum Screen, Vortex Grit Removal and Grit Classifier
- Secondary treatment system, BNR activated sludge treatmentwith centrifugal air blowers, fine bubble diffusers, and submersible mixers
- Secondary Clarifier with a diameter of 22.5 meter complete with RAS & WAS pumping
- Tertiary treatment system with a dual media filter using air scour blower and backwash water pumping system
- Recycle water treatment system, designed to reuse the treated water in the plant area, completed with a disinfection process,pH control system and the Pumping with ancillaries
- Sludge handling process using a mechanical sludge dewatering process with lime stabilization. The system include a holding tank with mixer, sludge feed pump, centrifuge machine,polymer feeding and lime storage and feeding system
- Odor control system with odor fan and soil bed filter.