Pumping Station at Chacheongsao (C3A)

Pumping Station at Chacheongsao (C3A)

Client: East Water and IT

Location: Chacheongsao

Features:

Pumping and air suppression system for large pumps. Accessories include vibration and temperature sensor and zero leakage butterfly valves

Completion Date: November 2000

Contract Value: 72.64 MB of total 134 MB

Aquathai worked as the mechanical subcontractor to ITD for the raw water pumping station from Bangpakong River in Chacheongsao for East Water.  The scheme was developed by the private water provider to the industries and water works in the area.
The scope of work includes the supply and installation services to:
  • Six (6) Raw water pumps, vertical turbine, each rated at
  • 1,872 m3/h
  • Design and supply of air suppression system
  • Handling system (hoist)
  • Interconnecting pipe work and accessories