Expansion and Rehabilitation Work at Chacheongsao Water

Expansion and Rehabilitation Work at Chacheongsao Water

CHACHEONGSAO

Client: Chacheongsao Water Company

Location: Chacheongsao, Thailand

Challenges:

The construction and rehabilitation activities were performed without interruption of water production.

Solution: Good project control and planning were implemented.

Completion Date: November 2002

Contract Value: 41,700,000 Baht

Aquathai had worked as a contractor to the Chacheongsao Water Company, a private water company, to complete a construction and commissioning services of an expansion and rehabilitation of a conventional water treatment plant.

The scope of work include the following:

  • Raw water pumping
  • Upgrade and rehabilitation of clarifier from 225 m3/h to 600 m3/h
  • Upgrade and rehabilitation of filter from 300 m3/h to 600 m3/h
  • New backwash water pipe for existing filter
  • New flocculation and clarifier of 600 m3/h
  • New filter house of 600 m3/h
  • Modification of main header pipe for the distribution system
  • New distribution pipe to Suwintawong Road
  • Various retrofit of pipe work and fittings
  • Reinforced Concrete Treated Water Tank of 3,000 m3
  • Landscape and buildings
  • Electrical and control work