Samsen I Water Treatment Plant
Client: Metropolitan Waterworks Authority (MWA)
Location: Bangkok, Thailand
Features: Large scale WTP with advance processes and a very small footprint.
Completion Date: 28 December 1994
Contract Value: 101.6MB of total 453.6 MB (G-SS-1A)
Aquathai had worked as a consortium partner to the Consortium of AQT-DGT-ITI. The project is on a turnkey basis and to be built in a very tight space situated in the oldest WTP in Thailand. The surrounding area is a landmark of the Thai Water Work. The plant is to be designed to expand the treatment capacity of up to 142,000 m3/d.
The scope of work include the local supply and installation of mechanical and electrical work with a commissioning service of the following equipment:
- Raw water pumping
- Lamella Pulsator Clarifiers
- Aquazur V Filters
- Chemical handling and dosing
- – Gas Chlorinators and neutralization
- – Alum
- – Polymer
- Transmission pumping station
- Laboratory
- Control and instrument and electrical work