Wastewater Treatment Plant at King Rama IV Hospital
Client: Rama IV Hospital
Location: Phetchaburi
Features: Activated sludge treatment plant
Completion Date: May 2002
Contract Value: 13.54 MB
The wastewater treatment plant work at King Rama IV or Phra Chomklao Hospital in Phetchaburi was a conventional construction work with a design by the local consultant. The work include the construction of plant and collection system within the hospital compound.
The scope of work include:
- Wastewater treatment plant
- Collection pipe work and building connection