Wastewater Treatment Plant at King Rama IV Hospital

Wastewater Treatment Plant at King Rama IV Hospital

RamaIV-Hospital

Client: Rama IV Hospital

Location: Phetchaburi

Features: Activated sludge treatment plant

Completion Date: May 2002

Contract Value: 13.54 MB

The wastewater treatment plant work at King Rama IV or Phra Chomklao Hospital in Phetchaburi was a conventional construction work with a design by the local consultant. The work include the construction of plant and collection system within the hospital compound.

The scope of work include:

  • Wastewater treatment plant
  • Collection pipe work and building connection