Wastewater Treatment System at Chiangmai

Wastewater Treatment System at Chiangmai

WWTP

Client: Public Work Department (PWD) and STECON

Location: Chiangmai

Features: Pumping and automatic bar screens at 10 pumping stations with all treatment plant equipment.

Completion Date: July 1996

Contract Value: 81.6 MB of total 331.1 MB

Aquathai worked as the M&E subcontracting to Sino-Thai Construction (STECON) for the central domestic wastewater treatment plant andpumping stations for the West Bank of City of Chiangmai.

The scope of work includes the construction and installation services to:

  • Aerators for Aerated Lagoon
  • Automatic bar screens
  • Pumping
  • Chemical system
  • Electrical control panel and electrical work
  • Interconnecting pipe work