Expansion and Rehabilitation Work at Chacheongsao Water
Client: Chacheongsao Water Company
Location: Chacheongsao, Thailand
Challenges:
The construction and rehabilitation activities were performed without interruption of water production.
Solution: Good project control and planning were implemented.
Completion Date: November 2002
Contract Value: 41,700,000 Baht
Aquathai had worked as a contractor to the Chacheongsao Water Company, a private water company, to complete a construction and commissioning services of an expansion and rehabilitation of a conventional water treatment plant.
The scope of work include the following:
- Raw water pumping
- Upgrade and rehabilitation of clarifier from 225 m3/h to 600 m3/h
- Upgrade and rehabilitation of filter from 300 m3/h to 600 m3/h
- New backwash water pipe for existing filter
- New flocculation and clarifier of 600 m3/h
- New filter house of 600 m3/h
- Modification of main header pipe for the distribution system
- New distribution pipe to Suwintawong Road
- Various retrofit of pipe work and fittings
- Reinforced Concrete Treated Water Tank of 3,000 m3
- Landscape and buildings
- Electrical and control work