Wastewater Treatment Plant at Eastern Industrial Estate (EIE)
Client: Eastern Industrial Estate (EIE)
Location: Rayong
Features: Concentric tank configuration of bioreactor and clarifier
Completion Date: December 1994
Contract Value: 71.2 MB
Aquathai worked as the M&E subcontracting to ITD for the central industrial wastewater treatment plant at Eastern Industrial Estate in Maptaput area. The plant was the oxidation ditch process with concentric bioreactor and secondary clarifier.
The scope of work includes the construction and installation services to:
- 12,000 m3/d WWTP
- Pretreatment (aerated grit removal, automatic bar screen, lift pump, parshall flume)
- Equalization and aeration tank
- Bioreactor with cage rotor aeration type
- Clarifier
- Sludge thickener
- Interconnecting pipe work
- Sludge dewatering by belt press and polymer feeding
- Electrical and control and instrument work