Wastewater Treatment Plant at Maptaput Industrial Estate
Client: IEAT and Italian-Thai Development (ITD)
Location: Rayong
Features: Series of WWTP in various locations within the Industrial Complex
Completion Date: February 1992
Contract Value: 31.45 MB, total
Aquathai worked as the M&E subcontracting to ITD for the central domestic and industrial wastewater treatment plants at Maptaput Industrial Estate.
The scope of work includes the construction and installation services to:
2,000 m3/d, each, Sewage Treatment Plant for Urban Area No.1, 2 and No.3
- Pump
- Sedimentation
- Aeration
- Chemical feeding
- Electrical cabinet
2,000 m3/d WWTP for supporting industrial area Phase II
- Pump
- Sedimentation
- Aeration
- Chemical feeding
- Electrical cabinet
500 m3/d WWTP at Maptaput Port
500 m3/d Solid waste disposal plant